Closed due to road construction in Lake Wales on State Road 60 EB/WB at US-27 and Alturas Road. Reported by 511 DOT
construction
US-19-ALTBoth NB/SB
Paving operations during the night in St Petersburg on Tyrone Blvd NB/SB between 5th Ave N / Tyrone Blvd and Park Street. Reported by FDOT Tampa Bay
construction
I-75SB
On-ramp closed in Pasco on I-75 SB on-ramp from WB SR-52 (Mm285). Reported by FDOT Tampa Bay
construction
SR-64Both EB/WB
Construction work in Heritage Harbour on SR 64 EB/WB from Grand Harbour Parkway to Lena Road. Reported by FDOT | @MyFDOT
construction
I-4WB
Long-term road construction in Orange on I-4 WB west of The Beachline (SR 528) (MM 72) to past Central Florida Pkwy (MM 71). Reported by FDOT-District 5
construction
US-41NB
Construction work in Punta Gorda on US 41 NB between William Street and Peace River Brg/Gilchrist Brg (South). Reported by DOT
construction
SR-29Both NB/SB
Bridge closed in Labelle on SR 29 NB/SB between Bridge St and County Rd 78. Reported by FL511
construction
I-4Both EB/WB
Interchange Improvements in Orange on I-4 EB/WB at SR 535 (MM 68). Reported by FDOT-District 5
construction
SR-60WB
Road construction. Right lane closed in Tampa on Adamo Drive (SR-60) WB before Channelside Drive. Reported by 511 DOT
construction
CR-575Both NB/SB
Closed due to road construction in Trilcoochee on Trilby Rd/Burwell Rd (CR 575) NB/SB between Breeden Rd. and US 301. Reported by FDOT Tampa Bay
construction
62nd AveBoth EB/WB
Road construction. Right lane closed in St. Petersburg on 62nd Ave North EB/WB at I-275. Reported by FDOT Tampa Bay
construction
Sand Lake RdBoth EB/WB
Paving operations in Orange on Sand Lake Rd/SR 482 EB/WB between Orange Blossom Trail/US 441 and Orange Ave. Reported by FDOT-District 5
construction
I-75None
Interchange Improvements in Pasco on I-75 at SR-52 (Mm285). Reported by FDOT Tampa Bay
construction
I-275Both NB/SB
Long-term road construction in Pinellas on I-275 NB/SB between 38th Ave N (Mm25) and 4th St N (Mm32). Reported by FDOT Tampa Bay
construction
54th Ave NWB
Ramps closed in St Petersburg on 54th Ave North WB cd ramp to SB I-275. Reported by FDOT Tampa Bay
construction
SR-586EB
Road construction. Right lane closed in Pinellas on Curlew Road (SR 586) EB after Countryside Blvd to past McMullen Booth Rd. Reported by 511 DOT
construction
Fruitville RdBoth EB/WB
Interchange construction in Sarasota on Fruitville Road (SR 780) EB/WB between Honore Avenue to past Coburn Road. Reported by FDOT
construction
I-275SB
Long-term road construction in Tampa on I-275 SB to EB I-4. Reported by FDOT Tampa Bay
construction
I-275SB
Off-ramp closed in Pinellas on I-275 SB off-ramp to 54th Ave N (Mm26). Reported by FDOT Tampa Bay
construction
I-4WB
Long-term road construction in Hillsborough on I-4 WB to NB & SB I-275. Reported by FDOT Tampa Bay